Open the drawing Tutorial\3.05 Pipe and pipe the heads in a zone to the corresponding valve. Turn on the LI-HEAD-ZONE layer when you need to see what heads are in a specific zone.
Open the drawing Tutorial\3.09 Verify Mainline and use the Verify Mainline function to see that the valves and quick couplers are connected to the mainline.