Well.... I have a huge project with 20 meters, all of which are supplied by HDPE. For some reason, the service line pipe material for all of them changed to Sch. 40 CPVC. Not a big deal to change them back, but it shouldn't have changed in the first place!
And the pipe manager... probably my fault for not paying enough attention, but I thought that once I set my pipe preference defaults, they would stay the same with every project, unless I changed the pipe info for a particular project. I think I missed a directive from a past update to go update my pipe preferences (which I just did), but why would they have changed in the first place?
Okay, enough whining.....
And the pipe manager... probably my fault for not paying enough attention, but I thought that once I set my pipe preference defaults, they would stay the same with every project, unless I changed the pipe info for a particular project. I think I missed a directive from a past update to go update my pipe preferences (which I just did), but why would they have changed in the first place?
Okay, enough whining.....
- Page :
- 1
There are no replies made for this post yet.