I get that 50% or more of the vertices in a hatch need to be included within the boundary of a work area for that hatch to be counted in work area schedules. How does this work with trees and shrubs - does the entire tree or shrub have to be contained within the work area, or some percentage of its area, or does even any small part cause it to be counted? Thanks.
- Page :
- 1
There are no replies made for this post yet.