Hi All,
Sorry if this has been covered, couldn't find it...
When I edit the symbol for a particular plant in my current project, it changes that plant in a previously worked-on project. In the new project I associated the plant with a groundcover hatch instead of a symbol and when I went back to the previously finished project, all of the symbols were gone from the drawing and regenerating the schedule omitted the plant entirely from the schedule as well. A look at the particular plant in the manager via the edit function showed that the new groundcover hatch from the other drawing was associated.
Not sure if I used the previous project's plant list as a template or starting point for this new one but I'm pretty sure I did. (Sorry, I'm new to LandFX and still trying to understand the quirks.)
Am I missing something?
Gracias, Gentle Graders.
Sorry if this has been covered, couldn't find it...
When I edit the symbol for a particular plant in my current project, it changes that plant in a previously worked-on project. In the new project I associated the plant with a groundcover hatch instead of a symbol and when I went back to the previously finished project, all of the symbols were gone from the drawing and regenerating the schedule omitted the plant entirely from the schedule as well. A look at the particular plant in the manager via the edit function showed that the new groundcover hatch from the other drawing was associated.
Not sure if I used the previous project's plant list as a template or starting point for this new one but I'm pretty sure I did. (Sorry, I'm new to LandFX and still trying to understand the quirks.)
Am I missing something?
Gracias, Gentle Graders.