By Chris Billete on Friday, 03 June 2016
Posted in Irrigation
Replies 2
Likes 0
Views 3.8K
Votes 0
Are there plans some how adding the Rain Bird QF Header into the list along with the transitions? For now I've been drawing a line after the transition point symbol to help with identifying end and center feed layout and editing the transition point information.
There are items on our wishlist currently that would allow adding the QF Header. For now this is not a part of how the system functions. This would be best served in a detail and if needed, the way you are currently doing things.
·
7 years ago
·
0 Likes
·
0 Votes
·
0 Comments
·
Here's my work-around: I put the QF header as an acceptable option in a sheet note.

If I need to show it separately or keep track of quantities, I use a second lateral pipe type and edit it as needed.
·
7 years ago
·
0 Likes
·
0 Votes
·
0 Comments
·
View Full Post