If I've got a large schematic area of, say, 300 gpm, and I want to break it up into 6 50gpm chunks, shouldn't each valve I pipe to the area show it's relative portion of that area (in the call-out), with appropriate pipe size? IOW, 6 valves, 6 call-outs showing 50gpm, and the appropriate pipe size? My current project is not doing that.