Is this possible? Not all the time, but like pressing "C" for colorize, how about "P" for precip? I know I can find this by connecting a control valve, sizing the pipe, then looking at the analysis via the edit/info button, but that's a lot of steps. I find I'm comparing the precip rates in different areas all the time, to decide if they can be zoned together.

I figure that if "highlight station" knows the total flow based on the heads connected, is it a stretch to show precip rate?

Thanks!
Currently the system only calculates the area and hence precip rate when you size the pipes. It’s certainly possible that after pressing something like P, it calcs the PR for what is highlighted.
Very interesting idea.