Land F/X
  • Portal
  • Products
    • Design F/X
    • Planting F/X
    • Irrigation F/X
    • F/X CAD
    • Plugin for Revit®
    • Plugin for SketchUp®
    • Lighting
    • Plugin for Rhino®
    • Manufacturer Connection
    • Academic
  • Support
  • Videos
  • Who We Are
  • Trial
  • Purchase
Land F/X
  • Portal
    • Dashboard
    • Account
    • Licenses
    • Data
    • Support
  • Products
    • Design F/X
      • Product
      • Features
      • Trial
      • Purchase
    • Planting F/X
      • Product
      • Features
      • Trial
      • Purchase
    • Irrigation F/X
      • Product
      • Features
      • Trial
      • Purchase
    • F/X CAD
    • Plugin for Revit®
    • Plugin for SketchUp®
    • Plugin for Rhino®
    • Site & Hardscape
    • Lighting
    • Manufacturer Connection
    • Academic
    • Purchase
  • Support
    • Knowledge Base
    • Documentation
    • Submit Ticket
    • Updates
    • Forum
    • Install
    • Remote Assistance
  • Videos
    • Power Tips
    • Webinars
  • Who We Are
    • Contact Us
    • Careers
    • Gallery
    • News
  1. Knowledge Base
  2. Planting
  3. Plant Schedules
  4. Plant Schedules With Work Areas: Spacing Issues

Plant Schedules With Work Areas: Spacing Issues

Quick video

Power Tip: Work Areas
x

Power Tip: Work Areas

Issue

You created Plant Schedules in a drawing containing multiple Work Areas, with the goal of placing a separate schedule for each distinct planting area. When you placed your schedules, you noticed that they are not lining up correctly. For example, the Remarks in your schedules may be lining up in such a way that they create excessive spacing between schedules.

 

Cause

This issue occurs specifically when you create Plant Schedules for multiple Work Areas with the Quantity before Name option checked in the Plant Schedule dialog box.

 

Solution

To prevent these spacing issues, leave the Quantity before Name option unchecked when creating Plant Schedules in drawings with multiple Work Areas.

 

Plant Schedule dialog box, Quantity before Name option unchecked

 

For more information on using Plant Schedules with Work Areas, see our Limiting Plant Schedules: Work Areas documentation.

Contact

  • Land F/X
  • PMB 351
    3940 Broad St. STE 7
    San Luis Obispo, CA 93401
  • +1 805-541-1003
Email Logo Facebook Logo Instagram Logo LinkedIn Logo
Land F/X Logo

Our software tailors AutoCAD®, Revit®, and SketchUp® to the needs of landscape architects, irrigation designers, and other professionals. We automate your most tedious tasks and ensure accuracy, giving you more time to design.

  • Portal
  • Products
  • Support
  • Videos
  • Who We Are